For sales and support visit:
hubbellpowersystems.com/contact/

Training and Application Video Library

Hubbell Power Systems offers a series of professionally-prepared DVDs for training, installation and information needs including distribution line maintenance (15 through 34.5 kV systems) procedures. Expert linemen provide up-to-date illustration of the maintenance procedures. They will make your training sessions for electric utility linemen more interesting and effective. The copyrighted training aids are typically 10 to 50-minute programs in color.

DVDs are available "free of charge." Each DVD contains an MPEG file of the title, which will play on Windows Media Player or QuickTime Player on your PC or Mac. Watch right at your desk. Once you have the DVD, distribute the file among your colleagues by making duplicate DVDs or store it on your network for easy retrieval. The DVDs you request are yours to keep, no need to return. You may make your own copies from the CDs/DVDs as long as they are reproduced in their entirety and include our credits.

Click here to order videos online.

Please include the title and number in your correspondence.


General Information

No. Title/Description Online Download Media
- Hubbell Power Systems - Company Overview.

View
   
- Hubbell Power Systems - Promise.

View
   
- Hubbell Power Systems - Branding.

View
   
OMV-19 Hubbell Power Systems
Informative overview video about the company.
Length: 4 min.
   
CD/DVD
-top of page-

Fargo®

No. Title/Description Online Download Media
F-1 Fargo: Fargo Training Tape.
Several programs on one tape show how to use Fargo products.
Length: 14 min.

View
   
-top of page-

Ohio Brass®

No. Title/Description Online Download Media
OB-1 Ohio Brass: Better By Design.
Discusses benefits of polymer-housed distribution arresters (PDV) by describing design and manufacturing.
Length: 15 min.

View
 
CD/DVD
OB-2 Ohio Brass: Designed & Tested to Be Only the Best.
Discusses OB's polymer material - ESP™ silicone alloy - used to manufacture its insulators and arresters.
Length: 12 min.

View
 
CD/DVD
-top of page-

Grounding

No. Title/Description Online Download Media
1 Equipotential Grounding Seminar
Classroom instruction covers single-point, dual-point and worksite temporary grounding practices in:
Part I - Principles and Development of Methods
Part II - Equipment Selection, Research Testing
Length: 41:30 min (two parts)

View


.zip (pt 1)



.zip (pt 2)

CD/DVD
3 In the Zone: Equipotential Grounding for De-energized Construction & Maintenance
Actual demonstrations show how to place dual-point and personal grounds on overhead distribution lines.
Techniques portrayed help reinforce sound reasons for the methods and step-by-step procedures.
Length: 9:25 min

View

.zip

CD/DVD
17 Chance: Protective Grounding-Set Tester.
This tape provides instructions for using Tester, Catalog No. C403-3220. The videotape also ships with the product as Part No. P403-3223.
Length: 8 min.

View

.zip

CD/DVD
-top of page-

Tool Care

No. Title/Description Online Download Media
13 Chance: Care and Maintenance of Tools and Protective Equipment.
The first section of this videotape deals with the care and maintenance of tools and protective equipment in the field. The second part covers the care and repair of tools and protective equipment carried out by the lineman at the warehouse-shop.
Length: 33 min.

View

.zip

CD/DVD
-- Chance: Inspection of Rubber Gloves in the Field
The first section of the video explains the more common physical damage that can occur to a rubber glove. The second section of the video explains the proper way inflate a glove in the field to check for any holes through the glove.
Length: 3 1/2 min.

View

.zip
 
-top of page-

Tools for Overhead Construction & Maintenance

No. Title/Description Online Download Media
23 Chance: Insulator and Crossarm Changeouts Rubber Gloving from an Aerial Device.
The objective here is lifting and securing one conductor clear of its insulator. The method uses a temporary conductor holder, rubber gloves and an aerial device on a tangent structure.
Length: 31 min.

View
 
CD/DVD
27 Chance: Hot Stick Maintenance of 69 kV Suspension (Single Pole Structures).
Changing insulators on Z-type structures. Changing insulators on two-arm suspension construction. Changing a crossarm on two-arm angle construction.
Length: 25 min.

View
 
CD/DVD
28 Chance: Maintaining Deadends and Running Corners on 69 kV.
Insulator changes on vertical-type deadends. Insulator changes on running corner.
Length: 20 min.

View
 
CD/DVD
29 Chance: How to Use Hot Sticks on 69 kV Post Insulator Construction.
Changing horizontal clamp-top post-type insulators. Changing insulators on vertical clamp-top, post-type construction.
Length: 16 min.

View
 
CD/DVD
37 Chance: Hot Sticking on EHV 345 kV H-Frame (Steel Arm) Suspension Insulator Change.
Using trolley pole to change string of insulators on end-of-arm and middle phase, single conductor construction.
Length: 14 min.

View
 
CD/DVD
45 Chance: Maintenance on Steel "H" Frames on 230 kV.
Shows deadend, V-string and suspension insulator changes on twin bundle lines, on steel pole H-frames. The deadend line is also worked by the barehand method.
Length: 15 min.

View
 
CD/DVD
53 Chance: Insulator and Crossarm Changeouts by Hot Sticking with Wire Tongs - Side Method.
This tape demonstrates the side method using wire tongs and wire tong saddles to secure the conductors.
Length: 27 min.

View

.zip

CD/DVD
63 Chance: Insulator and Crossarm Change, Auxilliary Arm Method.
In this live-line procedure the objective is to secure the conductors clear of the insulator with the lift method.
Length: 15 min.

View
 
CD/DVD
73 Chance: Deadend Insulator Changes Using Rubber Gloves from Insulated Platform.
The distribution deadend insulators are removed utilizing a tension puller and nylon slings. One of the linemen works from an insulated platform. All energized portions of the system are covered with safety coverup.
Length: 18 min.

View
 
CD/DVD
33 Chance: Single Insulator Changeout Using Rubber Gloves from an Aerial Device.
The objective here is lifting and securing one conductor clear of its insulator. The method uses a temporary conductor holder, rubber gloves and an aerial device on a tangent structure.
Length: 15 min.

View
 
CD/DVD
103 Chance: Pole Replacement - Rubber Glove Method from an Aerial Device.
This procedure shows how to lift and secure conductors to a new pole using rubber gloves and an aerial device.
Length: 39 min.

View

.zip

CD/DVD
123 Chance: Cutting-in a Disconnect Switch - Rubber Glove Method.
This training program illustrates the installation of a disconnect switch into each phase conductor. Rubber gloves are used while working from an insulated platform.
Length: 33 min.

View

.zip

CD/DVD
93 Chance: Deadend Insulator Changes Using Hot Sticks.
A similar procedure to the preceding video except the linemen work from the pole and use sticks to apply all cumalongs, slings and rope blocks.
Length: 17 min.

View
 
CD/DVD
113 Chance: Pole Replacement - Hot Stick Method.
Videotape demonstrates the method of installing a new pole beside one that is to be replaced, and then placing conductors on the new pole using hot sticks. An auger truck with a boom is also used to assist in the pole removal and installation.
Length: 41 min.

View
 
CD/DVD
143 Chance: Reconductoring or Upgrading Voltage with Extension Arms from an Aerial Device.
This training procedure shows how to move conductors in preparation for reconductoring or upgrading the voltage using extension arms, rubber gloves and an aerial device.
Length: 22 min.

View
 
CD/DVD
163 Chance: 345 kV Hot Line Tools Changing Insulators on Steel Tower.
Training session conducted at Kansas Gas & Electric Company shows boom-and-cradle method.
Length: 15 min.

View
 
CD/DVD
5 Chance: Three-Phase Boom Lift.
Demonstrates step-by-step procedures for using hot-line device on material-handler truck with boom-mounted winch. Details conventional-crossarm and armless-construction applications. Unit lifts one to four conductors, permits linework from truck buckets.
Length: 11 min.

View

.zip

CD/DVD
2 Chance: Nylon Strap Hoist and Link Stick Electrical Tests.
Conclusive series of 20 laboratory tests demonstrates the necessity for an insulated link stick whenever employing a nylon strap hoist for hot line applications. Test variables include: Three strap lengths, three voltages (7.62, 14.4 and 20 kV), and both wet and dry strap conditions.
Length: 10 min.

View
 
CD/DVD
16 Chance: Wet/Dry Hot Stick Tester.
This tape provides instructions for using Testers C403-3178 (115 VAC) or C403-3179 (230 VAC) to perform wet and dry testing. The videotape also ships with the product as Part No. P403-3239.
Length: 8 min.

View

.zip

CD/DVD
-- Chance Tool Trailers
Illustrates the features and benefits of Chance Tool Trailers along with multiple configuration options.
Length: 3 min.

View

.zip
 
-top of page-

Anchors & Foundations

No. Title/Description Online Download Media
14 Chance: Foundations for Lighting and Signage
Demonstrates the step-by-step procedure used to properly install these foundations. Also shows side-by-side comparison to time/cost for concrete. Recommended for those considering use of power-installed streetlight foundations and for crew training.
Length: 8:30 min.

View

.zip

CD/DVD
68 Chance: Power-Installed Screw Anchors (PISA®).
Video shows how to properly install PISA© anchors. Also, thorough instruction on how to maintain installing tools.
Length: 19 min.

View
 
CD/DVD
66 Chance: Chance Portable Anchor Installers.
Video showing proper operation of hydraulic and electric units.
Length: 9 min.

View
 
CD/DVD
OMV-5 Chance: Bumper Post Installation
The installation video shows the ease of installing Chance bumper post.
Length: 4 min.
   
CD/DVD
15 Chance Anchors: Made in the USA
Understand the standards and practices that make Chance anchors among the best in the world.
Length: 3 min.

View

.zip
 
-top of page-

Overhead & Padmounted Switches

No. Title/Description Online Download Media
7 Chance: D7 Switch Installation.
Shows in detail the convenient, one-lift field installation procedures of installing the Chance D7 unitized, pre-assembled overhead distribution switch. The configuration illustrated is a horizontal upright unit applicable for voltages of 15, 27 and 34.5 kV.
Length: 25 min.

View
 
CD/DVD
11 Chance: D7 Switch Installation with Reciprocating Operating Handle.
Illustrates a horizontal upright D7 switch being conveniently installed in a one-lift field installation. The D7 is a unitized, pre-assembled overhead distribution switch.
Length: 9 min.

View
 
CD/DVD
12 Chance: Converting Controls of the Chance D5 and D7 Switches.
This video covers the conversion of Type D5 and D7 overhead distribution switches from rotating controls to reciprocating pump handle controls.
Length: 5 min.

View
 
CD/DVD
10 Chance: Motor Operator for Pad-Mounted Switches.
An installation procedures video for padmounted switchgear applications where the utility desires powered operation either from a remote or local signal. Designed for the Chance AIS/608/LVS switches.
Length: 29 min.

View
 
CD/DVD
-top of page-

Sectionalizer

No. Title/Description Online Download Media
6 Chance: Electronic Sectionalizer Training Video.
Video shows the elements of application, operation and restoration of the sectionalizer.
Length: 12 min.

View
 
CD/DVD
9 Chance: Electronic Sectionalizer Installation.
Installation procedures and maintenance methods. A "how-to" instructional video on these distribution protective devices.
Length: 11 min.

View
 
CD/DVD
-top of page-

Factory-Formed Ties

No. Title/Description Online Download Media
56 Chance: Safe Tying with Chance Factory-Formed Line Ties.
Safe working practices and installation of Chance Line Ties. Illustrates installations and removals of line ties by hand, rubber gloves and hot line tools.
Length: 16 min

View
 
CD/DVD
71 Chance: Conductor to Insulator Tying With Chance Super Ties.
Shows how to properly install Chance Super Top-Ties® Line Ties.
Length: 11 min.

View
 
CD/DVD
353 Chance: How to Install Super Top-Tie® Line Ties.
Shot on user premises, shows how to install Super Top-Tie Line Ties.
Length: 15 min.

View
 
CD/DVD
-top of page-

Hot Line Clamps

No. Title/Description Online Download Media
54 Chance: Make the Right Connection.
Correct techniques and procedures in making a good low resistance connection with hot line clamps.
Length: 6 min.

View
 
CD/DVD
-top of page-

Distribution System

No. Title/Description Online Download Media
70 Chance: Building Blocks of an Overhead Distribution System.
Ideal training video for showing new personnel how Pole Line Hardware items are used on distribution systems. Shows a number of overhead configurations and how to use hardware.
Length: 21 min.

View
 
CD/DVD
-top of page-

Cutouts

No. Title/Description Online Download Media
  Cutout Seminar: July 17, 2012
Length: 27 min.

View

.zip
 
  Cutout Seminar: August 28, 2012
Length: 28 min.

View

.zip
 
343 Chance: C Loadbreak and Linkbreak Cutout.
Shows use and capabilities of Chance cutouts.
Length: 8 min.

View

.zip

CD/DVD
-top of page-

Fuses

No. Title/Description Online Download Media
23XF Chance: Fusing Distribution Transformers.
Illustrates how Chance SloFast Fuse Links eliminate unnecessary outages, protect the transformer from secondary faults, and protect the system from failed transformers.
Length: 11 min.

View
 
CD/DVD
-top of page-

Misc. Videos

No. Title/Description Online Download Media
-- USCO: Installing and Adusting USCO Power Switches.
This instruction video takes you step by step through the process of installing and adjusting all USCO group operated switches.
   
CD/DVD
-- Enclosures: Confined Spaces
Brief description of confined spaces, their inherent dangers and ways of designing around them.
Length: 20 min.
   
CD/DVD
-top of page-
Hubbell Power Systems All contents Copyright© 2001 - Hubbell Incorporated. All rights reserved. Because Hubbell has a policy of continuous product improvement, we reserve the right to change design specifications without notice.
Terms of Use | Contact Us | Site Map