Home › Resources › Training and Application Video Library
Hubbell Power Systems offers a series of professionally-prepared DVDs for training, installation and information needs including distribution line maintenance (15 through 34.5 kV systems) procedures. Expert linemen provide up-to-date illustration of the maintenance procedures. They will make your training sessions for electric utility linemen more interesting and effective. The copyrighted training aids are typically 10 to 50-minute programs in color.
DVDs are available "free of charge." Each DVD contains an MPEG file of the title, which will play on Windows Media Player or QuickTime Player on your PC or Mac. Watch right at your desk. Once you have the DVD, distribute the file among your colleagues by making duplicate DVDs or store it on your network for easy retrieval. The DVDs you request are yours to keep, no need to return. You may make your own copies from the CDs/DVDs as long as they are reproduced in their entirety and include our credits.
Click here to order videos online.
Please include the title and number in your correspondence.
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| - | Hubbell Power Systems - Company Overview. |
![]() View |
||
| - | Hubbell Power Systems - Promise. |
![]() View |
||
| - | Hubbell Power Systems - Branding. |
![]() View |
||
| OMV-19 | Hubbell Power Systems Informative overview video about the company. Length: 4 min. |
![]() CD/DVD |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| F-1 | Fargo: Fargo Training Tape. Several programs on one tape show how to use Fargo products. Length: 14 min. |
![]() View |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| OB-1 | Ohio Brass: Better By Design. Discusses benefits of polymer-housed distribution arresters (PDV) by describing design and manufacturing. Length: 15 min. |
![]() View |
![]() CD/DVD |
|
| OB-2 | Ohio Brass: Designed & Tested to Be Only the Best. Discusses OB's polymer material - ESP™ silicone alloy - used to manufacture its insulators and arresters. Length: 12 min. |
![]() View |
![]() CD/DVD |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| 1 | Equipotential Grounding Seminar Classroom instruction covers single-point, dual-point and worksite temporary grounding practices in: Part I - Principles and Development of Methods Part II - Equipment Selection, Research Testing Length: 41:30 min (two parts) |
![]() View |
![]() .zip (pt 1) ![]() .zip (pt 2) |
![]() CD/DVD |
| 3 | In the Zone: Equipotential Grounding for De-energized Construction & Maintenance Actual demonstrations show how to place dual-point and personal grounds on overhead distribution lines. Techniques portrayed help reinforce sound reasons for the methods and step-by-step procedures. Length: 9:25 min |
![]() View |
![]() .zip |
![]() CD/DVD |
| 17 | Chance: Protective Grounding-Set Tester. This tape provides instructions for using Tester, Catalog No. C403-3220. The videotape also ships with the product as Part No. P403-3223. Length: 8 min. |
![]() View |
![]() .zip |
![]() CD/DVD |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| 13 | Chance: Care and Maintenance of Tools and Protective Equipment. The first section of this videotape deals with the care and maintenance of tools and protective equipment in the field. The second part covers the care and repair of tools and protective equipment carried out by the lineman at the warehouse-shop. Length: 33 min. |
![]() View |
![]() .zip |
![]() CD/DVD |
| -- | Chance: Inspection of Rubber Gloves in the Field The first section of the video explains the more common physical damage that can occur to a rubber glove. The second section of the video explains the proper way inflate a glove in the field to check for any holes through the glove. Length: 3 1/2 min. |
![]() View |
![]() .zip |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| 23 | Chance: Insulator and Crossarm Changeouts Rubber Gloving from an Aerial Device. The objective here is lifting and securing one conductor clear of its insulator. The method uses a temporary conductor holder, rubber gloves and an aerial device on a tangent structure. Length: 31 min. |
![]() View |
![]() CD/DVD |
|
| 27 | Chance: Hot Stick Maintenance of 69 kV Suspension (Single Pole Structures). Changing insulators on Z-type structures. Changing insulators on two-arm suspension construction. Changing a crossarm on two-arm angle construction. Length: 25 min. |
![]() View |
![]() CD/DVD |
|
| 28 | Chance: Maintaining Deadends and Running Corners on 69 kV. Insulator changes on vertical-type deadends. Insulator changes on running corner. Length: 20 min. |
![]() View |
![]() CD/DVD |
|
| 29 | Chance: How to Use Hot Sticks on 69 kV Post Insulator Construction. Changing horizontal clamp-top post-type insulators. Changing insulators on vertical clamp-top, post-type construction. Length: 16 min. |
![]() View |
![]() CD/DVD |
|
| 37 | Chance: Hot Sticking on EHV 345 kV H-Frame (Steel Arm) Suspension Insulator Change. Using trolley pole to change string of insulators on end-of-arm and middle phase, single conductor construction. Length: 14 min. |
![]() View |
![]() CD/DVD |
|
| 45 | Chance: Maintenance on Steel "H" Frames on 230 kV. Shows deadend, V-string and suspension insulator changes on twin bundle lines, on steel pole H-frames. The deadend line is also worked by the barehand method. Length: 15 min. |
![]() View |
![]() CD/DVD |
|
| 53 | Chance: Insulator and Crossarm Changeouts by Hot Sticking with Wire Tongs - Side Method. This tape demonstrates the side method using wire tongs and wire tong saddles to secure the conductors. Length: 27 min. |
![]() View |
![]() .zip |
![]() CD/DVD |
| 63 | Chance: Insulator and Crossarm Change, Auxilliary Arm Method. In this live-line procedure the objective is to secure the conductors clear of the insulator with the lift method. Length: 15 min. |
![]() View |
![]() CD/DVD |
|
| 73 | Chance: Deadend Insulator Changes Using Rubber Gloves from Insulated Platform. The distribution deadend insulators are removed utilizing a tension puller and nylon slings. One of the linemen works from an insulated platform. All energized portions of the system are covered with safety coverup. Length: 18 min. |
![]() View |
![]() CD/DVD |
|
| 33 | Chance: Single Insulator Changeout Using Rubber Gloves from an Aerial Device. The objective here is lifting and securing one conductor clear of its insulator. The method uses a temporary conductor holder, rubber gloves and an aerial device on a tangent structure. Length: 15 min. |
![]() View |
![]() CD/DVD |
|
| 103 | Chance: Pole Replacement - Rubber Glove Method from an Aerial Device. This procedure shows how to lift and secure conductors to a new pole using rubber gloves and an aerial device. Length: 39 min. |
![]() View |
![]() .zip |
![]() CD/DVD |
| 123 | Chance: Cutting-in a Disconnect Switch - Rubber Glove Method. This training program illustrates the installation of a disconnect switch into each phase conductor. Rubber gloves are used while working from an insulated platform. Length: 33 min. |
![]() View |
![]() .zip |
![]() CD/DVD |
| 93 | Chance: Deadend Insulator Changes Using Hot Sticks. A similar procedure to the preceding video except the linemen work from the pole and use sticks to apply all cumalongs, slings and rope blocks. Length: 17 min. |
![]() View |
![]() CD/DVD |
|
| 113 | Chance: Pole Replacement - Hot Stick Method. Videotape demonstrates the method of installing a new pole beside one that is to be replaced, and then placing conductors on the new pole using hot sticks. An auger truck with a boom is also used to assist in the pole removal and installation. Length: 41 min. |
![]() View |
![]() CD/DVD |
|
| 143 | Chance: Reconductoring or Upgrading Voltage with Extension Arms from an Aerial Device. This training procedure shows how to move conductors in preparation for reconductoring or upgrading the voltage using extension arms, rubber gloves and an aerial device. Length: 22 min. |
![]() View |
![]() CD/DVD |
|
| 163 | Chance: 345 kV Hot Line Tools Changing Insulators on Steel Tower. Training session conducted at Kansas Gas & Electric Company shows boom-and-cradle method. Length: 15 min. |
![]() View |
![]() CD/DVD |
|
| 5 | Chance: Three-Phase Boom Lift. Demonstrates step-by-step procedures for using hot-line device on material-handler truck with boom-mounted winch. Details conventional-crossarm and armless-construction applications. Unit lifts one to four conductors, permits linework from truck buckets. Length: 11 min. |
![]() View |
![]() .zip |
![]() CD/DVD |
| 2 | Chance: Nylon Strap Hoist and Link Stick Electrical Tests. Conclusive series of 20 laboratory tests demonstrates the necessity for an insulated link stick whenever employing a nylon strap hoist for hot line applications. Test variables include: Three strap lengths, three voltages (7.62, 14.4 and 20 kV), and both wet and dry strap conditions. Length: 10 min. |
![]() View |
![]() CD/DVD |
|
| 16 | Chance: Wet/Dry Hot Stick Tester. This tape provides instructions for using Testers C403-3178 (115 VAC) or C403-3179 (230 VAC) to perform wet and dry testing. The videotape also ships with the product as Part No. P403-3239. Length: 8 min. |
![]() View |
![]() .zip |
![]() CD/DVD |
| -- | Chance Tool Trailers Illustrates the features and benefits of Chance Tool Trailers along with multiple configuration options. Length: 3 min. |
![]() View |
![]() .zip |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| 14 | Chance: Foundations for Lighting and Signage Demonstrates the step-by-step procedure used to properly install these foundations. Also shows side-by-side comparison to time/cost for concrete. Recommended for those considering use of power-installed streetlight foundations and for crew training. Length: 8:30 min. |
![]() View |
![]() .zip |
![]() CD/DVD |
| 68 | Chance: Power-Installed Screw Anchors (PISA®). Video shows how to properly install PISA© anchors. Also, thorough instruction on how to maintain installing tools. Length: 19 min. |
![]() View |
![]() CD/DVD |
|
| 66 | Chance: Chance Portable Anchor Installers. Video showing proper operation of hydraulic and electric units. Length: 9 min. |
![]() View |
![]() CD/DVD |
|
| OMV-5 | Chance: Bumper Post Installation The installation video shows the ease of installing Chance bumper post. Length: 4 min. |
![]() CD/DVD |
||
| 15 | Chance Anchors: Made in the USA Understand the standards and practices that make Chance anchors among the best in the world. Length: 3 min. |
![]() View |
![]() .zip |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| 7 | Chance: D7 Switch Installation. Shows in detail the convenient, one-lift field installation procedures of installing the Chance D7 unitized, pre-assembled overhead distribution switch. The configuration illustrated is a horizontal upright unit applicable for voltages of 15, 27 and 34.5 kV. Length: 25 min. |
![]() View |
![]() CD/DVD |
|
| 11 | Chance: D7 Switch Installation with Reciprocating Operating Handle. Illustrates a horizontal upright D7 switch being conveniently installed in a one-lift field installation. The D7 is a unitized, pre-assembled overhead distribution switch. Length: 9 min. |
![]() View |
![]() CD/DVD |
|
| 12 | Chance: Converting Controls of the Chance D5 and D7 Switches. This video covers the conversion of Type D5 and D7 overhead distribution switches from rotating controls to reciprocating pump handle controls. Length: 5 min. |
![]() View |
![]() CD/DVD |
|
| 10 | Chance: Motor Operator for Pad-Mounted Switches. An installation procedures video for padmounted switchgear applications where the utility desires powered operation either from a remote or local signal. Designed for the Chance AIS/608/LVS switches. Length: 29 min. |
![]() View |
![]() CD/DVD |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| 6 | Chance: Electronic Sectionalizer Training Video. Video shows the elements of application, operation and restoration of the sectionalizer. Length: 12 min. |
![]() View |
![]() CD/DVD |
|
| 9 | Chance: Electronic Sectionalizer Installation. Installation procedures and maintenance methods. A "how-to" instructional video on these distribution protective devices. Length: 11 min. |
![]() View |
![]() CD/DVD |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| 56 | Chance: Safe Tying with Chance Factory-Formed Line Ties. Safe working practices and installation of Chance Line Ties. Illustrates installations and removals of line ties by hand, rubber gloves and hot line tools. Length: 16 min |
![]() View |
![]() CD/DVD |
|
| 71 | Chance: Conductor to Insulator Tying With Chance Super Ties. Shows how to properly install Chance Super Top-Ties® Line Ties. Length: 11 min. |
![]() View |
![]() CD/DVD |
|
| 353 | Chance: How to Install Super Top-Tie® Line Ties. Shot on user premises, shows how to install Super Top-Tie Line Ties. Length: 15 min. |
![]() View |
![]() CD/DVD |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| 54 | Chance: Make the Right Connection. Correct techniques and procedures in making a good low resistance connection with hot line clamps. Length: 6 min. |
![]() View |
![]() CD/DVD |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| 70 | Chance: Building Blocks of an Overhead Distribution System. Ideal training video for showing new personnel how Pole Line Hardware items are used on distribution systems. Shows a number of overhead configurations and how to use hardware. Length: 21 min. |
![]() View |
![]() CD/DVD |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| Cutout Seminar: July 17, 2012 Length: 27 min. |
![]() View |
![]() .zip |
||
| Cutout Seminar: August 28, 2012 Length: 28 min. |
![]() View |
![]() .zip |
||
| 343 | Chance: C Loadbreak and Linkbreak Cutout. Shows use and capabilities of Chance cutouts. Length: 8 min. |
![]() View |
![]() .zip |
![]() CD/DVD |
| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| 23XF | Chance: Fusing Distribution Transformers. Illustrates how Chance SloFast Fuse Links eliminate unnecessary outages, protect the transformer from secondary faults, and protect the system from failed transformers. Length: 11 min. |
![]() View |
![]() CD/DVD |

| No. | Title/Description | Online | Download | Media |
|---|---|---|---|---|
| -- | USCO: Installing and Adusting USCO Power Switches. This instruction video takes you step by step through the process of installing and adjusting all USCO group operated switches. |
![]() CD/DVD |
||
| -- | Enclosures: Confined Spaces Brief description of confined spaces, their inherent dangers and ways of designing around them. Length: 20 min. |
![]() CD/DVD |
|
|
All contents Copyright© 2001 -
Hubbell Incorporated. All rights reserved. Because Hubbell has a policy of
continuous product improvement, we reserve the right to change design specifications
without notice.
Terms of Use | Contact Us | Site Map |