For sales and support visit:
hubbellpowersystems.com/contact/

Request Videos

To find our literature online visit the literature section of this website
* Required Fields
*First Name
*Last Name
*Company Name
*Street Address
*City
*State
*Postal Code
*Country
*Email Address
Job Title
Work Phone
Fax Number
Website

*Select video by checking the box beside each desired selection

Ohio Brass®

  • OB-1 - Ohio Brass: Better By Design
  • OB-2 - Ohio Brass: Designed & Tested to Be Only the Best

Grounding

  • 1 - Chance: Equipotential Temporary Grounding Seminar
  • S1 - Chance: Equipotential Temporary Grounding Seminar (Spanish)
  • 3 - Chance: Personal Protective Grounding
  • 17 - Chance: Protective Grounding-Set Tester
  • 52 - Chance: Don't Gamble With Temporary Grounding Practices
  • 153 - Chance: Temporary Grounding for De-energized Maintenance

Tool Care

  • 13 - Chance: Care and Maintenance of Tools and Protective Equipment

Tools for Overhead Construction and Maintenance

  • 23 - Chance: Insulator and Crossarm Changeouts Rubber Gloving from an Aerial Device
  • 27 - Chance: Hot Stick Maintenance of 69 kV Suspension (Single Pole Structures)
  • 28 - Chance: Maintaining Deadends and Running Corners on 69 kV
  • 29 - Chance: How to Use Hot Sticks on 69 kV Post Insulator Construction
  • 37 - Chance: Hot Sticking on EHV 345 kV H-Frame (Steel Arm) Suspension Insulator Change
  • 45 - Chance: Maintenance on Steel "H" Frames on 230 kV
  • 53 - Chance: Insulator and Crossarm Changeouts by Hot Sticking with Wire Tongs - Side Method
  • 63 - Chance: Insulator and Crossarm Change, Auxilliary Arm Method
  • 73 - Chance: Deadend Insulator Changes Using Rubber Gloves from Insulated Platform
  • 33 - Chance: Single Insulator Changeout Using Rubber Gloves from an Aerial Device
  • 103 - Chance: Pole Replacement - Rubber Glove Method from an Aerial Device
  • 123 - Chance: Cutting-in a Disconnect Switch - Rubber Glove Method
  • 93 - Chance: Deadend Insulator Changes Using Hot Sticks
  • 113 - Chance: Pole Replacement - Hot Stick Method
  • 143 - Chance: Reconductoring or Upgrading Voltage with Extension Arms from an Aerial Device
  • 163 - Chance: 345 kV Hot Line Tools Changing Insulators on Steel Tower
  • 5 - Chance: Three-Phase Boom Lift
  • 2 - Chance: Nylon Strap Hoist and Link Stick Electrical Tests
  • 16 - Chance: Wet/Dry Hot Stick Tester

Anchors & Foundations

  • 69 - Chance: How to Install Power Installed Streetlight Foundations
  • 68 - Chance: Power-Installed Screw Anchors (PISA®)
  • 66 - Chance: Chance Portable Anchor Installers

Overhead & Padmounted Switches

  • 7 - Chance: D7 Switch Installation
  • 11 - Chance: D7 Switch Installation with Reciprocating Operating Handle
  • 12 - Chance: Converting Controls of the Chance D5 and D7 Switches
  • 10 - Chance: Motor Operator for Pad-Mounted Switches

Sectionalizer

  • 6 - Chance: Electronic Sectionalizer Training Video
  • 9 - Chance: Electronic Sectionalizer Installation

Factory-Formed Ties

  • 56 - Chance: Safe Tying with Chance Factory-Formed Line Ties
  • 71 - Chance: Conductor to Insulator Tying With Chance Super Ties
  • 353 - Chance: How to Install Super Top-Tie® Line Ties

Hot Line Clamps

  • 54 - Chance: Make the Right Connection

Distribution System

  • 70 - Chance: Building Blocks of an Overhead Distribution System

Cutouts

  • 343 - Chance: C Loadbreak and Linkbreak Cutout

Fuses

  • 23XF - Chance: Fusing Distribution Transformers

Promotional Videos

  • OMV-5 - Chance: Bumber Post Installation
  • OMV-19 - Hubbell Power Systems

Misc. Videos

  • USCO: Installing and Adusting USCO Power Switches
  • Enclosures: Confined Spaces

Please note, an address must
be provided to receive videos.


Please enter Security Code from above:
 

Hubbell Power Systems All contents Copyright© 2001 - Hubbell Incorporated. All rights reserved. Because Hubbell has a policy of continuous product improvement, we reserve the right to change design specifications without notice.
Terms of Use | Contact Us | Site Map