For sales and support visit:
hubbellpowersystems.com/contact/

Video 63: Insulator or Crossarm Change, Auxiliary Arm Method

In this live-line procedure the objective is to secure the conductors clear of the insulator with the lift method.

Runtime: Approx. 15 min


This video requires Adobe Flash player.

Hubbell Power Systems All contents Copyright© 2001 - Hubbell Incorporated. All rights reserved. Because Hubbell has a policy of continuous product improvement, we reserve the right to change design specifications without notice.
Terms of Use | Contact Us | Site Map